Flex scheduler for cf.Objective available!

Yesterday the Flex-based scheduler for the 2008 cf.Objective() conference went live. I've had fun building it, and feel it's a good example of what's possible with ColdFusion, Flex, and about ten hours of time.

If you're not attending but what like to give it a whirl, feel free to play with the staging copy / play database, where we don't audit e-mail addresses for corresponding attendees.

Comments (Comment Moderation is enabled. Your comment will not appear until approved.)
Thanks for the staging copy, Joe. I'm not attending cf.Objective but really enjoyed playing with your app. As a new Flex developer, I'm soaking this stuff up like a sponge.
# Posted By Joshua Curtiss | 3/25/08 10:59 AM
Joe I would love to see how you did the horizontal calendar view.
# Posted By spiraldev | 4/1/08 12:39 AM
Maybe I'm doing something wrong but all I get is a blank calendar with times and rooms. How do I go about actually adding things to the schedule?
# Posted By w | 4/12/08 11:59 AM
© 2008 Firemoss, LLC
BlogCFC was created by Raymond Camden. This blog is running version 5.8.001.